Espanjantan Projects Department
Page 1 of 1
Espanjantan Projects Department
Treasury: 7.25MK
Industrial Capacity: 150PP
Infrastructure:
Industrial Capacity: 150PP
Infrastructure:
- Spoiler:
- 5x National Bank Branch (Parallel), 100PP, 50Mk. Starts 16:30 28/12/14, Ends 12:30 29/12/14
5x Industrial Park (Parallel), 100PP, 50Mk. Starts 16:30 28/12/14, Ends 12:30 29/12/14
5x Factory Farm (Parallel), 100PP, 50Mk. Starts 16:30 28/12/14, Ends 12:30 29/12/14
1x National Highway System, 80PP, 40MK. Starts 12:30 29/12/14, ends 20:30 1/1/15
Tech, 80PP, 40MK. Starts 23:00 30/12/14; Ends 15:00 1/1/15:
Scientific Starter - 10PP
Economic Domain - Military Domain - Scientific Domain 30PP
Fission - Energy - Strip Mining - 40PP
- Spoiler:
- Tech, 245PP (122.5PP), 61.25MK. Starts 13:00 12/1/14, ends 16:30 13/1/14
Gadgets, Rocketry, Aeronautics, Solar Energy - 65PP
Calculators, Liquid Rocket Fuel, Surface Control Trim, Swept Wings, Controlled Fission, Compact Panels - 115PP
High Altitude Engines, Advanced Instrumentation, Payloads, Computers - 65PP
The Cobbler- Posts : 512
Join date : 2014-05-23
Age : 26
Location : Netherlands
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|