The Njapontorian Space Program

View previous topic View next topic Go down

The Njapontorian Space Program

Post by Yuriski on Sun Dec 28, 2014 8:17 pm

Welcome to the Research and Development department for the Njapontorian Space Program. Below is a list of information published by the Njapontorian government.

Space Center Specifications:

  • 6 Launchpads.
  • Can accommodate 2 Launches per day.

Space Program Information:
Payloads:
Kosmos Series:
Kosmos-A: 1.2 PP / 0.6 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.

Kosmos-B: 2 PP / 1 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.

Kosmos-C: 4 PP / 2 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.
  • 2x OX-4(B) Photovoltaic Panels - 2 PP.

Smjelost Series:
Smjelost-01A: 2.2 PP / 1.1 MK.

  • Command Pod Mk1 (1 Crew) - 2PP.
  • Communotron 16 - 0.2 PP.
  • Mk16 Parachute - 1PP.

Smjelost-01B: 5 PP / 2.5 MK.

  • Command Pod Mk1 (1 Crew) - 2PP.
  • Communotron 16 - 0.2 PP.
  • Mk16 Parachute - 1PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.
  • OX-4(B) Photovoltaic Panels - 1 PP.

Prototypes:
Izotop:

Izotop X:

  • FL-T800 Fuel Tank - 2 PP,
  • LV N Atomic Rocket Motor - 4 PP.

Successful Missions:
Suborbital Launches and Atmospheric Tests:
First Unmanned Suborbital Launch - SUR-1 Lifter - Kosmos-A - Success.
First Manned Suborbital Launch - Munyar 1011 Lifter - Smjelost-01A - Success.
Orbital Launches:
First Orbital Launch - Munya 0011 Lifter - Kosmos-C - Operational.
Second MRNSA Satellite - Munya 0011 Lifter - Kosmos C - Operational.
Failures:
Suborbital Launches and Atmospheric Tests:
Second Manned Suborbital Launch - Munyar 1011 Lfter - Smjelost-01A - Explosion on Pad | 1 Deceased.
The Wall of Heroes:
Njapontorian Kosmonauts Killed on Mission:
L/Cmdr. Bogdan JuriĊĦa (Posthumous Hero of the Mountains Medal) - Fatal Explosion on Launchpad - 218 NR.


Last edited by Yuriski on Sun Jan 18, 2015 10:13 am; edited 9 times in total

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Tue Dec 30, 2014 2:42 pm

Initial Developments:

Spoiler:

Project completes in 65 hours (Friday, January 2, 2015 at 7:42:10 AM GMT)

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Fri Jan 02, 2015 4:24 pm

Further Research (Economic and Scientific Departments):

Spoiler:


Blue (Economic) Completes in 60 hours (Monday, January 5, 2015 at 4:25 AM GMT)
Green (Scientific) Completes in 75 hours (Monday, January 5, 2015 at 7:25 PM GMT)

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Tue Jan 06, 2015 5:37 pm

Construction of the Njapontorian Space Center (Space Complex and 1 Extra Launchpad).

Project completes in 50 hours (Thursday, January 8, 2015 at 7:40 PM GMT)

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Wed Jan 07, 2015 6:06 pm

Technological Update:

Spoiler:

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Thu Jan 08, 2015 8:41 pm

Extension of the First Launchpad Multiplex at the NLC (4 Launchpads).

Project completes in 60 hours (Sunday, January 11, 2015 at 8:40 AM GMT).

This extension will bring the total amount of launchpads at the NLC to 6 Pads. A further two multiplexes consisting of 6 pads each shall be constructed in the future.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Sun Jan 11, 2015 1:19 pm

Further Research (Scientific and Nuclear Departments):

Spoiler:

Orange (Nuclear) Completes in 50 hours (Tuesday, January 13, 2015 at 3:20 PM GMT).
Pink (Scientific) Completes in 75 hours (Wednesday, January 14, 2015 at 4:20 PM GMT).

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Mon Jan 12, 2015 6:10 pm

Kosmos-Series Payloads:

Kosmos-A: 1.2 PP / 0.6 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.

Kosmos-B: 2 PP / 1 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.

Kosmos-C: 4 PP / 2 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.
  • 2x OX-4(B) Photovoltaic Panels - 2 PP.


Construction of a Kosmos-A Payload. Construction completes Monday, January 12, 2015 at 7:22 PM GMT.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Wed Jan 14, 2015 6:27 am

Construction of two Kosmos-C payloads. Construction completes Wednesday, January 14, 2015 at 2:30 PM GMT.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Wed Jan 14, 2015 6:48 am

Izotop Program:

Izotop-X Development: 18 PP / 9 MK

  • FL-T800 Fuel Tank - 2 PP.
  • LV 2N Atomic Rocket Motor - 4 PP.


Development completes Thursday, January 15, 2015 at 1:00 AM GMT.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Wed Jan 14, 2015 6:51 am

Construction of a Kosmos-A payload. Construction completes Wednesday, January 14, 2015 at 9:14 AM GMT (Half-Speed).

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Thu Jan 15, 2015 7:00 am

Simultaneous construction of 2x Izotop-X. Construction completes Thursday, January 15, 2015 at 1:00 PM GMT.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Sat Jan 17, 2015 10:29 am

The following research has been completed, and the following blueprints have been purchased from the Kutan Empire.

Spoiler:

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Sat Jan 17, 2015 10:48 am

Smjelost-Series Payloads:

Smjelost-01A: 2.2 PP / 1.1 MK.

  • Command Pod Mk1 (1 Crew) - 2PP.
  • Communotron 16 - 0.2 PP.
  • Mk16 Parachute - 1PP.

Smjelost-01B: 5 PP / 2.5 MK.

  • Command Pod Mk1 (1 Crew) - 2PP.
  • Communotron 16 - 0.2 PP.
  • Mk16 Parachute - 1PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.
  • OX-4(B) Photovoltaic Panels - 1 PP.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Sat Jan 17, 2015 10:49 am

Construction of 2x Smjelost-01A. Construction completes Saturday, January 17, 2015 at 3:38 PM GMT.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Yuriski on Sun Jan 18, 2015 10:46 am

Aerodynamic Research:

Spoiler:

Research completes Tuesday, 20 January 2015, 05:15 AM GMT.

_________________

avatar
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 17
Location : United Kingdom

View user profile

Back to top Go down

Re: The Njapontorian Space Program

Post by Sponsored content


Sponsored content


Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum