The World In Your Hands
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The Njapontorian Space Program

Go down

The Njapontorian Space Program Empty The Njapontorian Space Program

Post by Yuriski Sun Dec 28, 2014 8:17 pm

Welcome to the Research and Development department for the Njapontorian Space Program. Below is a list of information published by the Njapontorian government.

Space Center Specifications:

  • 6 Launchpads.
  • Can accommodate 2 Launches per day.

Space Program Information:
Payloads:
Prototypes:
Successful Missions:
Suborbital Launches and Atmospheric Tests:
Orbital Launches:
Failures:
Suborbital Launches and Atmospheric Tests:
The Wall of Heroes:
Njapontorian Kosmonauts Killed on Mission:


Last edited by Yuriski on Sun Jan 18, 2015 10:13 am; edited 9 times in total
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Tue Dec 30, 2014 2:42 pm

Initial Developments:

Spoiler:

Project completes in 65 hours (Friday, January 2, 2015 at 7:42:10 AM GMT)
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Fri Jan 02, 2015 4:24 pm

Further Research (Economic and Scientific Departments):

Spoiler:

Blue (Economic) Completes in 60 hours (Monday, January 5, 2015 at 4:25 AM GMT)
Green (Scientific) Completes in 75 hours (Monday, January 5, 2015 at 7:25 PM GMT)
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Tue Jan 06, 2015 5:37 pm

Construction of the Njapontorian Space Center (Space Complex and 1 Extra Launchpad).

Project completes in 50 hours (Thursday, January 8, 2015 at 7:40 PM GMT)
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Wed Jan 07, 2015 6:06 pm

Technological Update:

Spoiler:
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Thu Jan 08, 2015 8:41 pm

Extension of the First Launchpad Multiplex at the NLC (4 Launchpads).

Project completes in 60 hours (Sunday, January 11, 2015 at 8:40 AM GMT).

This extension will bring the total amount of launchpads at the NLC to 6 Pads. A further two multiplexes consisting of 6 pads each shall be constructed in the future.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Sun Jan 11, 2015 1:19 pm

Further Research (Scientific and Nuclear Departments):

Spoiler:

Orange (Nuclear) Completes in 50 hours (Tuesday, January 13, 2015 at 3:20 PM GMT).
Pink (Scientific) Completes in 75 hours (Wednesday, January 14, 2015 at 4:20 PM GMT).
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Mon Jan 12, 2015 6:10 pm

Kosmos-Series Payloads:

Kosmos-A: 1.2 PP / 0.6 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.

Kosmos-B: 2 PP / 1 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.

Kosmos-C: 4 PP / 2 MK.

  • Probodobodyne HECS - 1 PP.
  • Communotron 16 - 0.2 PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.
  • 2x OX-4(B) Photovoltaic Panels - 2 PP.


Construction of a Kosmos-A Payload. Construction completes Monday, January 12, 2015 at 7:22 PM GMT.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Wed Jan 14, 2015 6:27 am

Construction of two Kosmos-C payloads. Construction completes Wednesday, January 14, 2015 at 2:30 PM GMT.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Wed Jan 14, 2015 6:48 am

Izotop Program:

Izotop-X Development: 18 PP / 9 MK

  • FL-T800 Fuel Tank - 2 PP.
  • LV 2N Atomic Rocket Motor - 4 PP.


Development completes Thursday, January 15, 2015 at 1:00 AM GMT.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Wed Jan 14, 2015 6:51 am

Construction of a Kosmos-A payload. Construction completes Wednesday, January 14, 2015 at 9:14 AM GMT (Half-Speed).
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Thu Jan 15, 2015 7:00 am

Simultaneous construction of 2x Izotop-X. Construction completes Thursday, January 15, 2015 at 1:00 PM GMT.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Sat Jan 17, 2015 10:29 am

The following research has been completed, and the following blueprints have been purchased from the Kutan Empire.

Spoiler:
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Sat Jan 17, 2015 10:48 am

Smjelost-Series Payloads:

Smjelost-01A: 2.2 PP / 1.1 MK.

  • Command Pod Mk1 (1 Crew) - 2PP.
  • Communotron 16 - 0.2 PP.
  • Mk16 Parachute - 1PP.

Smjelost-01B: 5 PP / 2.5 MK.

  • Command Pod Mk1 (1 Crew) - 2PP.
  • Communotron 16 - 0.2 PP.
  • Mk16 Parachute - 1PP.
  • Double-C Accelerometer - 0.2 PP.
  • PresMat Barometer - 0.2 PP.
  • GRAVMAX Negative Gravioli Dectector - 0.2 PP.
  • 2HOT Thermometer - 0.2 PP.
  • OX-4(B) Photovoltaic Panels - 1 PP.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Sat Jan 17, 2015 10:49 am

Construction of 2x Smjelost-01A. Construction completes Saturday, January 17, 2015 at 3:38 PM GMT.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Yuriski Sun Jan 18, 2015 10:46 am

Aerodynamic Research:

Spoiler:

Research completes Tuesday, 20 January 2015, 05:15 AM GMT.
Yuriski
Yuriski

Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom

Back to top Go down

The Njapontorian Space Program Empty Re: The Njapontorian Space Program

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum