Swedish Projects
Page 1 of 1
Swedish Projects
21/09/2015: 90 PP available | 90cu Available.
- - - Starts 21/09/2015, 20:30 BST
Construction of 3 National Bank Branches (2 Stockholm | 1 Oslo) at Parallel Half-Speed - 37.5 PP / 37.5cu / 50 Hours.
- - - Finishes 23/09/2015, 22:30 BST
- - - Starts 23/09/2015, 22:30 BST
Construction of 2 National Bank Branches (1 Gothenberg | 1 Turku) and 1 Farm (Stockholm) - 37.5 PP / 37.5cu / 50 Hours.
- - - Finishes 26/09/2015, 00:30 BST
27/09/2015: 20cu Remaining.
- - - Starts 21/09/2015, 20:30 BST
Construction of 3 National Bank Branches (2 Stockholm | 1 Oslo) at Parallel Half-Speed - 37.5 PP / 37.5cu / 50 Hours.
- - - Finishes 23/09/2015, 22:30 BST
- - - Starts 23/09/2015, 22:30 BST
Construction of 2 National Bank Branches (1 Gothenberg | 1 Turku) and 1 Farm (Stockholm) - 37.5 PP / 37.5cu / 50 Hours.
- - - Finishes 26/09/2015, 00:30 BST
27/09/2015: 20cu Remaining.
Yuriski- Posts : 844
Join date : 2014-05-23
Age : 24
Location : United Kingdom
Similar topics
» The Swedish Empire OOC and ST
» The Swedish Empire
» PDB-1 Projects
» American Projects
» Red Sun Projects
» The Swedish Empire
» PDB-1 Projects
» American Projects
» Red Sun Projects
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|