The World In Your Hands
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Segerlinen Space Administration

Go down

Segerlinen Space Administration Empty Segerlinen Space Administration

Post by Guest Mon Sep 29, 2014 1:47 pm

The Segerlinen Space Administration was opened the year 222.0.0 following the Kortugan calendar. Segerline hadn't focused much of anything on space due to its unfortunate past which lead to the undesire by the leaders or those with wealth to go to space. However following the coup, the SSA was announced to the people. No more would Segerline be dependent on foreign satellites for its every day needs, it would lead the world into the depths of space.

Propaganda poster for the SSA:

Current Launchers:

Ongoing Missions:

Finished Missions:

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Mon Sep 29, 2014 2:23 pm

Following the announcement of the SSA, the SSA soon got to work towards their grand plans. There were three programmes put to the table for the SSA and one launch vehicle to their fleet.

The Flieger programme would focus on understanding orbital manouvers and test new launch vehicles. The Schwatzen programme would focus on putting communications satellites into orbit, and finally the Reisen programme would focus on the navigational aspect of the space agency.

A launch vehicle was also announced and would be called the Arbeiter launch vehicle. It is designed to send smaller satellite payloads to around a 350ish km orbit around kerbin.

Begins development of the Arbeiter launch vehicle:

2x FL-T100 Fuel Tanks, 0,5 PP
2x FL-T200 Fuel Tanks, 1 PP
3x Rockomax 48-7s Engines, 6 PP

7.5 PP * 3 = 22,5 PP

Finished: 13.30 30th of September Swedish Time.

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Wed Oct 01, 2014 6:16 pm

Constructing the Flieger 1 mission for 9,55 PP, Finished 00.00 October 2nd Swedish time (double speed).

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Wed Oct 01, 2014 7:36 pm

The S.S.A can happily announce the beginning of a more enviromentally friendly programme of sorts. We will launch a series of Kerbin monitoring satellites that will track deforestation and exploitation of resources. The same images can also be used theoretically by urban planners to get better cities and a better overview of their development.

Begins production of KerSat 1 04.30 2nd of October Swedish Time.

10 PP for instruments.
10 PP for other instruments.

40PP, Finished 14.30 the same day Swedish Time. (Double time increase PP but reduce this to a 10 hour production)

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Mon Oct 06, 2014 9:09 am

In a massive project to expand our space capabilities. The S.S.A together with the S.S.D has pulled their resources to highly expand the our space center with four new launch pads. Another KerSat is also being built to finish the KerSat Constellation.

Producing KerSat 2 for 20 PP. Finished 06:00 7th of October Swedish Time.

Producing 4 launch pads parallel for 15 PP each. Finished 01:00 7th of October Swedish Time.

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Mon Oct 27, 2014 10:26 am

The head of the S.S.A today announced the first S.S.A manned mission. While Bardeman had on a joint Kahlawian-Segerlinen space mission, reached space before. It was time for Segerline to actually send their kerbals to space on their own without foreign help. Ten kerbals has been taken out for Kosmonaut training to be the first to bring glory to the fatherland.

Researching Kerb-Rated Modules for 25 PP (Blueprints) 12.25 28th of October and Flightsuits for 10 PP(Blueprints) Finished 21:25 27th of October Swedish Time.

A Arbeiter Launch Vehicle has also been put into production.

Producing Arbeiter Launch Vehicle for 7.5 PP 18.55 27th of October

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Sun Nov 23, 2014 9:42 am

The Arbeiter Launch Vehicle has been standing on the assembly building for too long, and now it is finally time after all turmoil to send the first Segerlinen Launched Kerb to space. The construction of the crewed payload was under way as the factory worked around the clock to get it done. It also started the construction of a second Launch Vehicle for the next mission.

Long live socialist engineering.

Construction of MK 1 command pod + MK16 parachute for 3 PP finished 13.40 23rd of November

Development of the Minmus III Launcher for 176.4 PP (double speed) finished 26th of November 06.30 Swedish time.

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Sun Nov 23, 2014 5:04 pm

The Minmus III launch vehicles production is way under way. While it is designed to take really heavy payload into space, it can also be used to take several lighter satellites or even entire constellations into space if there is enough room. There are currently four constellations that are considered to be launched and produced.

SATCOM: A communications satellite network that will make Segerline independent from foreign communications satellites.

KENASY: KErbin NAvigational SYstem is a Segerlinen navigational system that will be used by armed forces and civilians alike. It will provide accurate data on your location and will not be turned off from civilian use during wartime. There will be four user stages in the satellite system itself. Civilian use will be the least accurate but still very accurate, no fees are needed to be paid. Commercial use will cost a small fee per year and will have a better accuracy than a civilian version. The military version costs 4 MK and will be more accurate than the commercial version. Then there is the Segerlinen version which only the armed forces of Segerlinen may use. It is the most accurate version that the satellite can allow.

MIDESAT: Nature and purpose classified, will be revealed at a later date. Licenses may or may not be sold in the future.

FORESAT: Completely classified.

The first satellite to be produced is FORESAT-1 which will be launched in the test mission with the new Minmus III launcher.

Producing FORESAT-1 for 19.3 PP Finished 13.15 24th of November Swedish Time.

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Sun Nov 30, 2014 8:36 am

Production of 1x Minmus III Launcher, Finished 00.00 31st of November. 58.8 PP (Double Speed)

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Guest Thu Dec 04, 2014 11:23 am

Production of 2x Minmus III launchers, Finished 5th of December 03.15. 117.6 PP (Double speed parallel)

Guest
Guest


Back to top Go down

Segerlinen Space Administration Empty Re: Segerlinen Space Administration

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum